Looking for the start of your campervan conversion, a more comfortable day van or to take the rough edge off your work van? Our Essentials Package might be what you are looking for!Â
The package includes;
- Bulkhead removal.
- Sound deadening and insulation. – DodoMat Thermo Liner, fleece EVO.
- Plywood floor, ceiling and sides. – 12mm floor and 5.5mm sides/ceiling as standard.
- Carpet lining. – 9 colour choices.
- 2mm thick floor covering. – 6 Etiquette colour choices, 10’s of Altro colour choices.
PLUS;
12v electric set up comprising of;
- 100-120ah AGM Leisure battery
- 6 way fuse box
- CBE Panel with 2x USB, 1x Cigarette Lighter, 1x Light switch
- 6x LED spotlights
- Optional 140w Victron Solar Panel / Scanstrut Gland / Victron Solar MPPT
- Optional Victron DC/DC battery charger
Depending on the vehicle choice this typically requires 4-7 workshop days.
Once completed, you will be ready to take your next steps with van furniture or another solution to suit your needs.
As with everything, we offer various options, so every build is discussed and planned prior to starting.
We take on any make, model or age of vehicle! Be it a brand new Sprinter or a classic Volkswagen, we are on board, so if your van is not listed as an option, contact us to discuss your requirements.
If you have any questions about any conversion packages, please get in touch here.